Construction Technology of Prestressed Guy Cable for 126m Long Span Double Cable-Stayed String Truss for West Pavilion in Theme Pavilion 主题馆西馆126m跨双索张弦桁架预应力拉索施工技术
A joint lever is arranged on the joint, and can press the push rod when pulled by a guy cable to open the valve core. 接头上有接头杠杆,在拉索的拉动下能够压动顶杆,打开阀芯。
Guy Cable Design of Vertical Axis Wind Turbine 立轴风力机的拉索设计
Stress analysis of points supporting curtain wall in a guy cable system 一种点式幕墙拉索结构的受力分析
A scheme of guy cable supporting system is put forward for practical design. 结合工程实例提出一种拉索结构布置方案;